Instruction execution time for slim OLEDs?
The datasheet for the NHD-0420DZW shows a maximum execution time for each instruction, but the datasheet for the NHD-0420CW does not? Do I need to wait for instructions to be executed, or can I send new ones right away as long as I respect the timing diagram (I2C shows 1.3us minimum between transmissions)?
0
-
I would say follow the timing diagrams.
0
Please sign in to leave a comment.
Comments
1 comment